Texas Aqueduct Project — working draft, September 2026. Every figure on this site is drawn from a public source: the Texas Water Development Board, USGS, the Edwards Aquifer Authority, groundwater conservation district records, and the 2027 State Water Plan. Engineering values are computed from stated assumptions and are order-of-magnitude. Water-level readings are as of September 6, 2026.